COMMERCIAL PROJECTS

IMG_1052_edited.jpg

Stihl Shop, Rotorua

Project Summary:

 

Picasso Painters took part in the painting of the new Stihl Shop in Rotorua, ensuring a flawless execution that reflected the brand's identity. With a focus on precision and meeting specific safety requirements, we successfully completed the project within the designated timeframe, just in time for their grand opening.

 

Project Details:

 

1. Interior and Exterior Painting: Our team meticulously painted the interior and exterior of the Stihl Shop using the branding colors of green and grey. The chosen color scheme not only created a cohesive look but also reinforced the Stihl brand identity, welcoming customers with a visually appealing atmosphere.

 

2. Fireproof Paint for Workshop: As the Stihl Shop deals with equipment like chainsaws and mowers, safety was of utmost importance. We applied fireproof paint to the workshop area, ensuring that the space met the required safety standards to minimize the risk of fire hazards.

 

3. On-Time Completion: Understanding the significance of the grand opening, we worked diligently to finish the project within the specified timeline. Our commitment to delivering on time allowed the Stihl Shop to welcome their customers without any delays.

​

Project Completion: 2 weeks

Farm Source, Rotorua

Project Summary:

 

Picasso Painters undertook the revitalization of the Farm Source building in Rotorua, addressing an unsightly rust-like stain caused by unbalanced chemical washing. Our skilled team effectively restored the building's appearance by applying a durable sealer and painting it with the brand's distinct colors, resulting in a refreshed and brand-new look.

 

Project Details:

 

1. Sealing and Restoration: The building at Farm Source faced an issue with a rust-like stain due to the improper application of chemicals during the washing process. We assessed the situation and implemented a thorough sealing process to prevent any further damage to the building's exterior. This restoration step was crucial to prepare the surface for the upcoming painting.

 

2. Brand Colors and Professional Finish: With attention to detail, we meticulously painted the building using Farm Source's signature brand colors. The choice of colors aligned the building with the brand's identity, leaving a lasting impression on visitors and customers. Our professional painting technique ensured a flawless finish, contributing to the overall aesthetics of the property.

​

Project Completion: 2 weeks

untitled-3.jpg
untitled-7.jpg

Brandt, Rotorua

Project Summary:

 

Picasso Painters successfully completed the rebranding project for Brandt, formerly known as John Deere. The task involved transforming the building's color scheme from yellow and green to the new corporate color, black, in line with the brand's updated image. Despite the time constraints and challenging weather conditions during winter, our dedicated team completed the project in just 1 week, exceeding the expectations of both Picasso Painters and the Brandt team.

 

Project Details:

 

1. Rebranding Challenge: The project required a swift and seamless transition from the previous color scheme to the new corporate color of Brandt. The building's exterior was previously painted in yellow and green, reflecting the identity of John Deere. Our task was to match the new corporate color, black, in a visually appealing manner.

 

2. Efficient Execution: Picasso Painters embraced the challenge and demonstrated remarkable efficiency in the execution of the rebranding. Despite the time constraints and the weather challenges typical of winter, our skilled team completed the painting project within 1 week, ensuring minimal disruption to Brandt's operations.

 

3. Customer Satisfaction: The collaboration between Picasso Painters and the Brandt team resulted in a successful rebranding project. Both parties were delighted with the outcome, and the building now proudly displays the new Brandt corporate color, contributing to the brand's refreshed image.

​

Project Complete: 1 week

Sudima Hotel, Rotorua

Project Summary:

 

Picasso Painters successfully undertook a full repair and repaint project for Sudima Hotel, transforming it with the brand's new colors. This ambitious project required extensive scaffolding and the use of boom lifts to cover the entire exterior of the hotel. Despite the challenge of working during the busiest time of the year from October to December, our skilled team completed this large-scale project within a remarkable 10-week timeframe. Throughout the project, Sudima Hotel continued its normal business operations, while our team demonstrated exceptional speed and quality workmanship, leaving everyone amazed by the final result.

 

Project Details:

 

1. Complete Transformation: The project involved a complete repair and repaint of Sudima Hotel, bringing it in line with the brand's new colors and image. Our expert team meticulously prepared the exterior surface before applying the new paint, ensuring a flawless and long-lasting finish.

 

2. Extensive Scaffolding and Boom Lifts: To access every part of the hotel's exterior, Arrow Scaffolding erected extensive scaffolding. This enabled our team to work efficiently and safely on all sections of the building, even those at considerable heights.

 

3. Time-sensitive Project: The project took place during Sudima Hotel's busiest period, between October and December. Despite this challenging timeframe, our dedicated team maintained exceptional professionalism and efficiency throughout the project.

 

4. Minimal Disruption: Throughout the 10-week project duration, Sudima Hotel continued to operate its regular business activities, thanks to the strategic planning and execution of Picasso Painters. Our team prioritized minimal disruption, ensuring the hotel's guests and staff were not inconvenienced.

​

Project Completion: 10 weeks